Rugby Union Uniforms for Nations Championship Finals November 2026
The 2026 Nations Championship Finals take place November 27–29, 2026 at Twickenham Stadium in London. Teams competing need match kits, training gear and travel wear ready weeks in advance. Here's what to order and when.
💲 Current rugby prices (2026) — see the live price guide →
Quick answer: The 2026 Nations Championship Finals take place November 27–29, 2026 at Twickenham Stadium in London. Teams competing need match kits, training gear and travel wear ready weeks in advance. If you're preparing uniforms for a squad or academy, ordering now ensures delivery before the finals—production typically takes 2–6 weeks depending on quantity.
What Rugby Union Uniforms Do You Need?
Competing teams and academies should prepare at least:
- Match Kit (jersey, shorts, socks) — primary colours for home, secondary for away if playing multiple matches
- Training Tops — lightweight jerseys for warm-ups and practice days leading into Finals Weekend
- Compression Base Layers — undershirts for cold November weather in London
- Rain Jackets — waterproof bench and travel jackets with crest or club emblem
- Club Hoodies — warm fleece for team wear before and after matches
- Coach & Staff Polos — for coaching staff, medical team and touchline officials
- Kit Bags — large equipment bags for transport to Twickenham
Many teams order a Team Kit (match kit + training top) or the Full Club Package to cover every need across the tournament weekend and training camp leading up to it.
Fabrics Built for Tournament Play
All our rugby jerseys use heavy-duty, fast-drying fabric built for wet November weather. We offer rugby-specific materials that resist tearing during contact, dry quickly and hold team colours through multiple matches and washes. Sublimation printing gives unlimited colours for complex crests and designs; embroidery adds a premium look on polos, jackets and caps.
Production Timeline: When to Approve & Pay
Delivery depends on how many uniforms you're ordering. These times are counted from when you approve the digital mockup and complete payment:
| Order Size | Production & Delivery Time |
|---|---|
| Under 50 pieces | 14–20 days |
| 50–100 pieces | 20–25 days |
| Over 100 pieces | 4–6 weeks |
For November 27 delivery: Work backwards from your needed date. If you're ordering under 50 pieces with a 14–20 day timeline, mockup approval and payment should be completed by early November. For 50–100 pieces (20–25 days), aim for late October. For 100+ pieces (4–6 weeks), approval and payment should happen by mid-to-late October. Every order includes a free digital mockup in your team colours, ready for review within 24 hours. We reply within an hour—usually faster.
If your date is very close or has already passed, contact us immediately. Rush orders may be possible after our production team confirms capacity.
Pricing by Quantity
Prices drop significantly with volume. Here are real examples for two popular packages:
| Product | 10–24 Pieces | 25–49 Pieces | 50–99 Pieces | 100–249 Pieces | 250+ Pieces |
|---|---|---|---|---|---|
| Match Kit (jersey + shorts + socks) | $59 | $56 | $51 | $45 | $40 |
| Full Club Package (match kit + training + hoodie + rain jacket + bag) | $238 | $224 | $205 | $181 | $162 |
All prices include worldwide delivery to one address. Minimum order is 10 pieces per style (mixed youth and adult sizes allowed). For example, 20 players with a Match Kit costs around $1,180 (10–24 tier); 50 players costs around $2,550 (50–99 tier).
Design & Customization
Most tournament teams already have established colours and crests. We work from:
- Pantone colour references or brand guidelines
- Vector artwork (AI, EPS, SVG) or PDF sketches of your logo or crest
- Physical colour samples if you prefer to match existing kit
Sublimation printing delivers unlimited colours and sharp detail—ideal for complex crests, gradients and multi-colour designs. Embroidery adds a premium look for crests on polos, jackets and caps. Tackle twill creates a classic pro look for stitched-on numbers and lettering.
Sample Options Before Bulk Order
We always provide a free digital mockup of your design in your team colours—no cost, no obligation. If you want to see the real fabric, fit and decoration before committing to a full order:
- Video sample: $50 per piece. We make your design as a real garment and send a detailed video (5–7 days) showing fabric close-up, stretch, print quality, stitching and measurements. $50 is credited to your bulk order if placed within 14 days.
- Physical sample: $100 per piece including express shipping to you.
- Pre-production sample: Every bulk order includes a free sample video before production starts—we film the first piece, you approve it, then we make the rest.
Reorders & Roster Updates
Academies and clubs often need new rosters each season or new players added mid-year. We keep your approved artwork, fabric specs and colour on file. When you have a new roster, send us the player list with sizes, names and numbers—we reorder quickly using your existing designs and standard timelines apply.
Next Steps: Request Your Quote
Ready to order? Here's what to send us:
- Your needed delivery date (should be before November 27, 2026)
- How many players and staff you're outfitting
- Your team colours (Pantone, hex code or samples)
- Logo or crest (artwork file or description)
- Which products you need (match kit, training tops, rain jackets, etc.)
Contact CJP APPAREL now for a free quote and digital mockup:
- Email: enquiry@cjpapparel.com
- Phone: +1 (727) 610-7322
- Address: 7901 4th St N, STE 300, St. Petersburg, FL 33702
We reply within an hour—usually much faster. We'll confirm pricing, your production timeline and next steps by email, and send a free digital mockup of your design in your team colours within 24 hours.
Related Reading
For more on tournament uniforms and team apparel ordering:
Frequently asked questions
01How much time do I have left to order uniforms for the Nations Championship Finals?+
If you're ordering for teams competing in Finals Weekend (Nov 27–29), work backwards from that date. Under 50 pieces takes 14–20 days from approval and payment, so mockup approval should happen by early November. For 50–100 pieces (20–25 days), aim for late October. For 100+ pieces (4–6 weeks), approval should be mid-to-late October. If your date has passed or is coming up very soon, contact us immediately—rush orders may be possible after our team confirms capacity.
02Can we order just 15 uniforms for a small academy squad?+
Yes. Our minimum is 10 pieces per style, and you can mix youth and adult sizes. Fifteen uniforms fall into the 10–24 piece tier. A Match Kit (jersey + shorts + socks) is $59 per set at that quantity—delivery included—so 15 sets would be around $885 total. You still get a free digital mockup and production time of 14–20 days from approval and payment.
03What if we already have a team design and just want to reorder?+
Perfect. We keep your approved artwork, colours and specs on file. Send us the new roster with player names, numbers and sizes, and we can reorder on the same timeline. Standard production takes 14–20 days (under 50 pieces) to 4–6 weeks (100+ pieces) from approval and payment.
04Do you ship to the UK (since the Finals are at Twickenham)?+
Yes. We deliver worldwide, including the UK. Delivery is included in all our prices. We confirm the specific delivery method and arrival date with your quote, so you know exactly when uniforms will arrive at your address.
05What if I don't have artwork yet? Can you help with the design?+
Yes. Send us a description of your team colours, logo or crest (or a sketch, photo, or reference), and we'll prepare production-ready artwork. <a href="/custom-design">Our design service is included</a>—we show you a free digital mockup before production starts, so you can approve the look before we make anything.
Planning rugby uniforms?
Send your idea, quantity and deadline. We reply with pricing, a free digital mockup and a production plan. MOQ from 10 pieces, delivery included.

























